HYDRO POWER PLANT at a glance
HYDRO POWER PLANT is a simplified joint-stock company (France) registered under SIREN number 531 256 410. Founded on 1 February 2011, its head office is located at 2 ALLEE DE LONGCHAMPS, VANDŒUVRE-LES-NANCY (54500) and it operates in engineering, technical studies (NAF code 71.12B). Its workforce is in the 10 to 19 employee range.
For the 2025 financial year, HYDRO POWER PLANT reported revenue of 7.21 M€, down 5.2% year on year, with total assets of 6.72 M€ and net profit of 233 K€. Share capital: 444 K€. It has 2 active establishments and 29 BODACC notices. Officers: YZICO, YZICO AUDIT, PP CONSEIL, INDUSTEAM S.A.
To assess risk, RUBI provides the Coface solvency score and credit opinion.
- Net revenue 2025
- 7.21 M€
- -5.2% vs 2024
- Net income 2025
- 233 K€
- Total assets 2025
- 6.72 M€
- Equity 2025
- 1.13 M€
Assess the risk of working with HYDRO POWER PLANT
Solvency score
Solvency score
Coface score from 0 to 10 reflecting the probability of default over the next 12 months.
Measures the ability of HYDRO POWER PLANT to meet its financial commitments.
Unlock the scoreCredit opinion
Credit opinion
Maximum outstanding amount Coface considers reasonable for a supplier to grant this company.
Credit amount Coface considers reasonable to grant to HYDRO POWER PLANT
Unlock the credit opinionSolvency score and credit opinion issued by Coface
HYDRO POWER PLANT activity
Revenue (€) – by financial year
Employees
10 to 19
(as of 2022)
Total Assets (€)
Legal Information
-
SIREN531 256 410
-
SIRET (head office)531 256 410 000 48
-
EasyNumber®Information not available
-
Legal FormSimplified joint-stock company (France)
-
VAT NumberFR72531256410
-
RCS RegistrationRegistered(on 27/01/2015)
-
RNE RegistrationRegistered (on 01/02/2011)
-
RCS Number531 256 410 R.C.S
-
Share Capital444,400.00 EUR
Activity
-
NAF or APE code71.12B (Engineering, technical studies)
-
Business activity sectorArchitectural and engineering activities; technical testing and analysis
-
Founded1 February 2011
-
ExecutivesYZICO YZICO AUDIT PP CONSEIL INDUSTEAM S.A
HYDRO POWER PLANT financials
EBITDA (€)
EBITDA
The profit generated by the business itself, before interest, taxes and depreciation.
Working Capital Requirement
-1.54 M€
Over the last 12 months
Days sales outstanding
95 days
Over the last 12 months
Return on sales
3.24%
Over the last 12 months
Key indicators
Financial profile
EBITDA
The profit generated by the business itself, before interest, taxes and depreciation.
Working Capital Requirement
The cash the business must front to keep operating while it waits to be paid by its customers.
HYDRO POWER PLANT documents
HYDRO POWER PLANT establishments
2 Active establishments
6 Closed establishments
75009 — Secondary establishment
75018 — Secondary establishment
BODACC notices
29 Announcements
-
6 August 2026Dépôts des comptes - Comptes annuels et rapports (2025-12-31)
-
8 August 2025Dépôts des comptes - Comptes annuels et rapports (2024-12-31)
-
30 March 2025Modifications diverses - modification survenue sur l'administration
-
24 July 2024Dépôts des comptes - Comptes annuels et rapports (2023-12-31)
-
12 June 2024Modifications diverses - Modification survenue sur l'administration, transfert du siège social.
-
3 September 2023Dépôts des comptes - Comptes annuels et rapports (2022-12-31)
Frequently asked questions about HYDRO POWER PLANT
-
For the 2025 financial year, HYDRO POWER PLANT generated net revenue of 7.21 M€, down 5.2% on 2024 (7.6 M€).
-
-
-
PP CONSEIL and INDUSTEAM S.A. Statutory auditors: YZICO and YZICO AUDIT.
-
HYDRO POWER PLANT’s share capital is €444,400.00.
-
71.12B – Engineering, technical studies.
-
2 ALLEE DE LONGCHAMPS, 54500 VANDŒUVRE-LES-NANCY
-
HYDRO POWER PLANT’s workforce is in the 10 to 19 employee range (2022 data).
-
HYDRO POWER PLANT has 2 active establishments (VANDŒUVRE-LES-NANCY, BOURGOIN-JALLIEU) and 6 closed establishments.
-
Payment period data is available to registered users. Create a free account to see HYDRO POWER PLANT’s payment behaviour.